Our team prepared a pre-design report to determine the scope of modernizing all six (6) elevators in L&I’s Tumwater building, including cost estimates, construction schedule, and options for intermediate repairs to improve elevator operation without duplicating costs of replacing parts in the future modernization.
We then worked with L&I to complete the design for the 6 elevator cab interiors and lobby improvements. We prepared full construction documents, performed construction administration, all while working closely with the GC to phase the work to remain on schedule without disrupting building occupants. The final cab and lobby upgrades were completed in 2022.